KCN AN PHAT – HAI PHONG
Total land area
8.92 ha
Address
An Phat High-Tech Industrial Park, Km47, National Highway 5, Viet Hoa Ward, Hai Phong City
Location
| Proximity to:
-
Located in the West of Hai Phong City Center
-
Hanoi Central Business Districts65km (50’)
-
Noi Bai International Airport90km (80’)
-
Hai Phong Port50km (60’)
SURROUNDING MANUFACTURERS
BROTHER, CANON, CARGILL, CJ VINA AGRI, FORD, HUYNDAI KEFICO, REGINA MIRACLE
POPULATION
1,932,090 (2023)
MINIMUM WAGE
4,160,000 VND (REGION II -2023)
ADVANTAGES
- High-quality construction with hybrid design.
- Facility management, competitive rental rate.
- Competitive labor cost.
- The project is located in Hai Duong city – one of the cities located in the center of the Red River Delta and the Northern key economic region, belonging to two important economic corridors with China: Kunming – Lao Cai – Hanoi – Hai Phong – Quang Ninh and Nam Ninh – Lang Son – Hanoi – Hai Phong – Quang Ninh
- Hai Duong’s infrastructure system is highly developed, convenient for transporting to and from Hanoi, as well as and other industrial provinces such as Bac Ninh, Bac Giang, Hung Yen, Hai Phong, through National Highway 5 and National Highway 5B. In addition, the travel time from the project to key areas, such as seaports (Cai Lan port, Hai Phong port) and international airports (Noi Bai, Cat Bi), is only within 1 hour and 30 minutes, making it convenient for import and export activities of goods and materials.
Allowed industries
High-tech
industry
industry
Clean
technology
technology
Electronic
Light industry
Food processing
Automotive
Facilities
Fire Fighting System
Public Parking
Solar Panel
24hr Security with Security Booth, Fence
Products
READY-BUILT
FACTORY
FACTORY
READY-BUILT
HYBRID
HYBRID
READY-BUILT
WAREHOUSE
WAREHOUSE
KCN AN PHAT – HAI DUONG |
RBF, RBH
RBF, RBH
SPECIFICATION
| RBH | RBF – 1 FLOOR | RBF – 2 FLOORS | |
|---|---|---|---|
| Leasable Area | 30,994.9 sqm | 9,360 sqm | 22,258.6 sqm |
| Unit size | From 3,697.4 sqm | From 977 sqm | From 2,679 sqm |
| Clear Height | 10.5m | 7.5 m | 7.5 m |
| Floor Load Capacity | 3 tons/sqm | 2 tons/sqm | 2 tons/sqm |
| Handover | Q3/2026 | Q3/2026 | Q3/2026 |
You might also like