PHU AN THANH – LONG AN
PHU AN THANH – LONG AN (RBF & RBH)
Land Area
13.4ha
Product Type
Ready built factory (RBF)
Ready built hybrid (RBH)
Address
Lot A6-2, A7, A8, A17-1, A18, A19-2, Doc 2 Road, Phu An Thanh Industrial Park, An Thanh Commune, Ben Luc District, Long An Province, Vietnam
Location
+ Proximity to Long An Port: 40km (60’)
+ Proximity to Cat Lai Port: 45km (1h20’)
+ Proximity to HCM CBD: 37km (60’)
+ Proximity to Tan Son Nhat Int’l Airport: 38km (1h10’)
Surrounding Manufacturers
LOCK&LOCK, GREENFEED, JOLLIBEE, CARGILL
Facilities
- Fire fighting system
- Parking
- 24hr security with security booth, fence
- Solar Panel
Long An Population
1,763,754 (2021)
Minimum Wage
3,930,000 VND (Region II)
*According to Decree No.
90/2019/NĐ-CP on 15 November, 2019
Advantage of the projects
- High-quality construction with hybrid design.
- International management, competitive rental rate.
- Near residential area (Nam Long – Ben Luc Residence, Waterpoint Residence…), abundant labor force and competitive labor cost
- The project is located in the southern key economic region and is the gateway connecting the Southeast to the Mekong Delta. There is an inland waterway port in the industrial park, which is convenient for transporting, loading and unloading raw materials and goods.
- Convenient for commuting to and from Ho Chi Minh City through Ho Chi Minh – Trung Luong highway, National road 1A within 1 hour.
- Environmentally friendly by equipping solar panels for factories.
- Enjoy attractive tax incentives.

Specification
RBF | RBH | |
---|---|---|
Leasable Area | 60,914 sqm | 29,602 sqm |
Unit size | From 2,560 sqm to 15,360 sqm | From 3,624 sqm to 14,496 sqm |
Clear Height | 7.5m | 10.5M |
Floor Load Capacity | 2 tons | 3 tons |
Fire Fighting | As per current codes | As per current codes |
Power | 100kva/1,000sqm | 25-100kva/1,000sqm |
Available | Phase 1: Q4 2022 Phase 2: Q2 2023 |
Phase 1: Q4 2022 Phase 2: Q2 2023 |
Please contact us for more information »








Previous
Next
Get in touch